About the Stormwater Review Process

The purpose of the Stormwater Plan Review is to manage runoff and encourage natural infiltration and ensure all proposed development complies with federal, state, and local regulations.

What is the Purpose of a Stormwater Overlay?

  • Managing stormwater runoff from land alteration and disturbance activities in accordance with watershed management plans.
  • Assuring that development activities do not result in increased stormwater flows.
  • Utilizing and preserving the desirable existing drainage system by preserving flood capacity of streams.
  • Stream quality maintainence and improvement in accordance with watershed managment.
  • Encouraging natural infiltration of rainfall to preserve groundwater recharge.

When is a Stormwater Plan required?

Stormwater Plan Reviews are triggered by one or more of the following:

  • 10,000 square ft. of land disturbance (any grading, excavation or fill activities that occur on a site) or 5,000 square ft. increase in impervious surface.
  • Publicly Funded Development * - Any development funded in whole or in part by public monies of at least $1,000,000, and that are in the form of any grant, loan that is forgiven or discounted below the market rate over the life of the loan, bond financing, infrastructure improvements related to a project, below-market sale or lease of property, or other form of financial assistance with an aggregate value over the life of all planned phases of development
  • Publicly Funded Redevelopment * - Any land-disturbing activity that results in the creation, addition, or replacement of five hundred (500) square feet or more of impervious surface area at a Publicly Funded Development.

How long will the process take?

The length of the review process depends on the complexity of the project.

What is required for a Stormwater Plan review?

The following drawings are the minimum required for Stormwater Plan Review:

  • Cover Sheet
  • Introduction/Executive Summary
  • Existing Conditions
  • Stormwater Analysis
  • Easements, Right-of-Way, Deed Restrictions
  • Other Permits/Approvals
  • Maintenance Program
  • Conclusion
  • Appendices

How do I start the Process?

Please e-mail Josh Lippert, Senior Environmental Planner, any electronic submissions at joshua.lippert@pittsburghpa.gov:

  • Conceptual Stormwater Plan (optional)
    • During Zoning application submission
  • Final Stormwater Plan & Completed Checklist
    • Concurrent with site plan review or Pre-Development Plan (PDP) review and approval
  • Modifications/Re-submissions
    • Any changes to a submitted Final SWM Plan require a re-submission and approval.

How do I end the Process?

After you have resolved any issues, the Environmental Planner will prepare a consistency letter for the applicant. They will also prepare the project file for the Zoning & Development Review Division.

Zoning and Building Codes

For more Information

For questions specific to the City of Pittsburgh, please email the Senior Environmental Planner. Please note that this page summarizes broad issues around stormwater management. Please consult the complete Zoning Code and Building Code as necessary for complete information on requirements.